Franklin-Street-(3) | Mulhall Construction
316
attachment,attachment-template-default,single,single-attachment,postid-316,attachmentid-316,attachment-jpeg,bridge-core-3.0.6,qode-page-transition-enabled,ajax_fade,page_not_loaded,,vertical_menu_enabled,qode-title-hidden,qode_grid_1300,side_area_uncovered_from_content,qode-theme-ver-29.3,qode-theme-bridge,disabled_footer_top,disabled_footer_bottom,qode_header_in_grid,elementor-default,elementor-kit-1084

Franklin-Street-(3)

Initial set-up and move-in - Protection (where applicable) - Daily and on-going clean-up Review and progress checked at separate phases/stages - Safety reviews - Project cleaning On-site Management & Coordination: Subcontractor scheduling & coordination, inspection times, client & architect meetings * Demolition, Excavation and removal of Debris Temporary Facilities - Porto-toilet Rental Allowance 8' of No. 4 type shear apllication 2 No. HDU8 C 8 No. Dowel Drill and Epoxy Grade beam and Concrete Sheetrock work Paint and prime were aplicable Demolition 1no. Debris boxes Type X Fire sheetrock installed and mudded 8' of No. 2 type shear apllication 8 no. 5/8' sill bolting 1 No. HDU8 Hold-downs 8 No. Dowel Drill and Epoxy 60 no. A35 teco's 2 no. LPT4 teco's 4 No. 6x6 Posts 8' of 3x6 new stud wall Grade beam and Concrete 2yrds Escavation 1 half day for pumping Stucco replacement Stucco demo 1 SQF. Painting (1 prime and 2 top coats) on all sheetrock and stucco

Initial set-up and move-in – Protection (where applicable) – Daily and on-going clean-up Review and progress checked at separate phases/stages – Safety reviews – Project cleaning On-site Management & Coordination: Subcontractor scheduling & coordination, inspection times, client & architect meetings * Demolition, Excavation and removal of Debris Temporary Facilities – Porto-toilet Rental Allowance 8′ of No. 4 type shear apllication 2 No. HDU8 C 8 No. Dowel Drill and Epoxy Grade beam and Concrete Sheetrock work Paint and prime were aplicable Demolition 1no. Debris boxes Type X Fire sheetrock installed and mudded 8′ of No. 2 type shear apllication 8 no. 5/8′ sill bolting 1 No. HDU8 Hold-downs 8 No. Dowel Drill and Epoxy 60 no. A35 teco’s 2 no. LPT4 teco’s 4 No. 6×6 Posts 8′ of 3×6 new stud wall Grade beam and Concrete 2yrds Escavation 1 half day for pumping Stucco replacement Stucco demo 1 SQF. Painting (1 prime and 2 top coats) on all sheetrock and stucco

No Comments

Post A Comment